This China mining accommodation container serves as a construction site flat pack container house and a rugged mobile office container.
32,000 M² PRODUCTION BASE & OVER 1200 STAFFS
We are the first and only prefab house supplier using a fully automatic production line in China.
Certification
Our Commitment to Quality Assurance:
| CE | SGS Cement Fiberboard Asbestos-free Certificate |
| ISO9001:2015 | SGS Rock Wool Wall Panel Asbestos-free Certificate |
| Utility Patent | SGS Powder Coating Test Coating ROHS Test |
| Alibaba Verified | SGS Raw Materials Frame ROHS Test |
| Aluminumfoil face EPS sandwich panel test | Decoration project qualification |
| Glass wool test report | New patent certificate |
| Rock Wool Board Testing Report |
Fiber Cement Board AS 4964 test delivery note and report |
| Rock wool sandwich panel AS 4964 test delivery note and report | MGO Board AS 4964 test delivery note and report |
introduce
Guangdong Cbox Co., Ltd, which covers 350,000 square meters and has an annual output of 200,000 containers(500+ sets per day), focuses on designing and developing, producing, selling, installing, operating, and serving as a whole, providing one-stop box rental and manufacturing for customers.
After 17 years of hard work by the company's core team, it has obtained 46 invention patents and utility model patents. The workshop is equipped with automated robotic arms to reduce labor costs and reduce costs for customers.
Guangdong Cbox Co., Limited has 29 factories, and the product categories produced include flat-pack container houses, detachable container houses, detachable flat pack container houses, foldable container houses, slide folding container houses, portable toilets, etc.
We take the need of a customer as the base, green safe, economical, and comfortable living experience as the root and development of the industry as the purpose.
With the support of automatic manipulators and excellent sales engineers, CBOX is confident that we can meet the requirements of customers on quality, quantity, and even technical guidance.
C-BOX Prefab Container House
Steel: Q235B Stainless Steel, 2.3mm. Q235B has certain elongation, strength, good toughness and castability, easy to punch and weld, and is widely used in the manufacture of general mechanical parts. It is mainly used for welded structural parts with high quality requirements in construction and bridge engineering.
| 1. Bottom frame corners | 2. Bottom frame secondary beam (12*2.0 C-shaped steel) | 3. Bottom frame long side beam (5635mm) |
| 4. Cement fiber board (18mm) | 5. 2mm PVC carpet | 6. Column cover (2600mm) |
| 7. Column (2535mm) | 8. UPVC windows + anti-theft net | 9. Ceiling color steel plate |
| 10. Glass wool insulation layer | 11. Roofing color steel plate (0.45mm) | 12. Top frame secondary beam |
| 13. Top frame long side beam (5635mm) | 14. Top frame corners | 15. Top frame short side beam (2690mm) |
| 16. Top frame secondardy beams | 17. Top frame long side beam (5635mm) | 18. Column (2535mm) |
| 19. 50mm diamater drain pipe | 20. Rock wool sandwich panel(75mm) | 21. Skirting lines |
| 22. Bottom tie beam square tube | 23. Bottom frame short side beam (2690mm) |
Quick Assembly and Disassembly: A mobile office container can be set up or taken down swiftly, making them suitable for rapidly changing circumstances, shifting extraction fields, or emergency mining situations.
The Speed of Modular Infrastructure: Choosing this pre-engineered framework eliminates the long delays and high labor costs of a traditional modular home built on site, allowing you to crane the units into place and hook up utilities immediately.
All-Weather Worksite Protection: Every construction site flat pack container house we manufacture features a heavy-duty galvanized steel framework and high-density insulation panels, offering an incredibly safe environment compared to standard temporary tents or flimsy wood shacks.
Turnkey Administrative Flexibility: The interior layout of this convenient portable container office can be customized with data lines, workstations, and manager desks, ensuring your site operations remain efficient, organized, and fully productive from day one.
Feature Of Detachable Flat Pack Office Containers
Built for Extreme Remote Conditions: Procuring a genuine China mining accommodation container guarantees a reinforced structural asset specifically engineered to withstand harsh desert heat, sub-zero mining climates, and heavy resource extraction dust.
Streamlined Worksite Infrastructure: Deploying a construction site flat pack container house network gives your project managers a standardized, highly organized layout that easily provides safe housing for hundreds of workers within days.
Instant Administrative Command: Having a dedicated mobile office container on-site ensures your engineering, safety, and logistical teams have a secure, air-conditioned, and soundproofed hub to run daily operations smoothly.
Rapid Multi-Functional Setup: Utilizing a convenient portable container office platform allows companies to easily move their entire administrative setup from one completed mining vein or construction phase to the next without damaging the structure.
Product Details
Cabin Hospital: Fast, Durable, Safe
Type: Flat Pack Prefab Container Cabin Hospital
Application: Responding to a sudden illness that results in the need to isolate patients or expand the hospital.
Advantages: The installation time is short, 7-20 days, depending on the project. We have participated in or independently completed 15 makeshift hospital projects, including the famous project Huoshenshan Hospital.
Office:Removable, Expandable, Reusable, 20 Years Life
Type: Flat Pack Prefab Container Office
Application: Temporary offices in construction sites, office built in workshops, low-cost outdoor offices.
Advantages: Short installation time, 1-15 days, depending on the project, a single container office only needs one day to complete the installation.
Dormitory: Fast, Fully Furnished, Stable
Type: Flat Pack Prefab Container Dormitory
Application: Due to site conditions, or the need to build a dormitory in a short period of time. Advantages: Short installation time, 2-15 days, depending on the project. We can provide a variety of supporting facilities, such as beds, air conditioners, tables and so on.
C-BOX Service
other Details
FAQ
Contact: Nanna Lee
Tel: +86 13631414627
Company Address: No. 6, Xinkai Road, Wusha Community, Daliang Subdistrict, Shunde District, Foshan City, Guangdong Province, China